Brian Leary 6690 S. Billings Way Centennial Co. 80111 Cell 404-219-7071 acmewireless@gmail.com QUALIFICATION HIGHLIGHTS •Over 20 years of experience in
the wireless telecommunications construction industry. •
Dedicated, resourceful, and decisive individual. •
Q.C. oriented. Have helped write standards for various
companies. •
Demonstrated skill in working independently or within a team. •
Proven ability to work under changing, fast-paced environments. •
Handle multiple tasks concurrently; •
Organized; •
Experienced in complete problem resolution. •Proven leader in tough
situations. •The ability to
build and maintain business relationships while delivering innovative
business solutions. •Strongly self-motivated,
enthusiastic and business oriented. SKILLS HIGHLIGHTS •Broad knowledge of all phases of
cell site construction and operation. NSB (both colo and raw land) Drop
and swaps as well as MOD’s and upgrades. •Strong trouble shooting skills
at the cell level and network level. •Strong understanding of the
workings of a wireless network . •Good understanding of MS Office
Suite. •Very familiar with test
equipment and standards. •Strong ability to drive people,
schedules and projects to make dead lines. •Good understanding of Microwave
backhaul solutions. •Strong understanding of RF
performance needs. SUMMERY OF WORK PERFORMED MORE INFORMATION AVAILBE UPON
REQUEST. Sr. Project Manager Westower Communications RMR
11-13-1/15 Responsible for all D&S and MOD
projects as well as some NSB in Montana and Wyoming. Worked with the ATT PM’s
to schedule and perform 1C-LTE 2C scopes. Managed budgets for all projects.
Managed all CM’s in MT and WY as well as the GC’s that worked on the project.
Completed 40 projects between May and September. Project Manager Mycom Int.
7/12-11/13 Managed CM’s for both T Mobile
and ATT. Primary project was for T Mobile to prepare for the upgrade to LTE
as well as, depending on the site, install LTE. Performed quality audits, managed
budgets and deadlines. Worked close with NSN as well as T Mobile.
Sr. Construction Manager Westower Communications PNW
3/12-7/12 Managed all CM’s for the startup
and roll out of ATT LTE for the Seattle metro market. Responsible for
schedules of 14 CM’s to insure we met deadlines and budgets for all sites.
Worked close with ALU to make the process as seamless as possible. At our best
we were turning out 80 RTS a month. National Integration / Tech.
Services Manager G4S Technology (formally
Adesta) Open Range Communications Project. 11/10-3/12 Responsible for overseeing the
installation and integration of WiMax and Microwave gear for the
national roll out of Open Range Communications. Worked closely with Alverion,
Aviat, ORC and our field techs to resolve any and all problems that came up
during install and or integration. Tracked progress and set schedule for
upcoming sites. Planned resources, nation wide, depending on work load.
Reported directly to the client via daily meetings, on all aspects of field
activity. Regional Integration / Tech.
Services Manager MyCom USA – Open Range
Communications Project. 11/09-11/10 Responsible for overseeing the
installation and integration of WiMax and Microwave gear for the national
roll out of Open Range Communications. Worked closely with Alverion, Aviat
and our field techs to resolve any and all problems that came up during install
and or integration. Tracked progress and set schedule for upcoming sites.
Planned resources, nation wide, depending on work load. Reported directly to
the client via daily meetings, on all aspects of field activity. Mycom left
the project. Construction Manager BCI West Clearwire project
4/09- 8/1/09 Responsible for the management of
installation of Clearwire sites in the Las Vegas market. Project included NSB
and CoLo sites. This was a cradle to grave project. Worked closely with
Clearwire with internal CM’s to get the sites ready and approved for
commercial launch. This market had mostly co-located sites with a few new
builds. Resposinable for the turn over packages for all the BCI managed
sites. Backhaul Manager Cleveland
WiMax -Lucent Alcatel for Sprint Nextel
10/07-04-08 Responsible for the coordination
of the backhaul for the Wimax system. The network was to be completely
short hop microwave served by 14 A Hub sites with microwave shots to carry
all the traffic. The entire network was to start with 222 sites. My
objectives included working with M.W. Design to ensure the design would work
in the field. Survey the A hubs for constructability, and work with both the
AAV and LEC to provide service to the A Hubs. I worked on behalf of Sprint as
a liaison between ALU and Sprint. Construction Manager Lucent Alcatel for Sprint
Nextel
Wisconsin
4/07- 10/07 Responsible for managing the
civil work for the swap out of equipment from outdoor Nortel to outdoor
Lucent Mod Cell equipment. I set the schedule, tracked progress, performed
pre and post walks, performed quality audits with Sprint and whatever else
needed to be taken care of. I worked closely with Lucent and Sprints implementation
and operations groups. RF/QA Field Coordinator Bechtel Telecoms Cleveland OH.
Cingular UMTS/
INT.
5/6 –10-07 I helped implement an aggressive
construction schedule and drove the contractors to meet that schedule every
day. I worked with the Market Manager and Lead Field Coordinator to resolve
construction hold ups. Worked with Cingular RF and Net Ops. To resolve
Technical hold ups. Cingular War Room Lead. Bechtel Telecoms Atlanta GA.
Cingular UMTS/ INT.11/04-5/06 Overseeing all activities in the
war room for the UMTS / Integration project. That War Room took the place of
the NOC and Switch. We had 6 engineers working on the network from the War
Room. We had control of all sites and all the platforms. Lead Field Coordinator Bechtel Telecoms. Cingular
AL/Miss. GSM Birmingham AL.11/03-11/04 I was the Lead Field Coordinator
in addition to all the same duties I did for Atlanta GSM. We built a
construction schedule and instituted a morning call with all contractors to
drive the schedule. I performed about 80 new site build design walks with
site acquisition in north Florida and Southern Alabama. RF/QA Field Coordinator Bechtel Telecoms. Atlanta GA.
Cingular Atlanta GSM 11/02-11/03 I wrote the market spec for sweep
tests. I was the resident trouble shooter for sites with technical issues. I
was an interface between Network Operations and Bechtel to resolve problems.
I ended up working in the Cingular building setting up and running the War
Room. I reviewed all sweep tests for turn over. Western Regional RF/ QA
Coordinator. EPC Jobs / Bechtel - AWS
Project Program Team Seattle
WA.
11/01-11/02 Traveled market-to-market
assisting with RF issues, sweep tests, quality problems, training of
coordinators and contractors. I performed Quality Audits to verify the end
product was up to the standard set forth. I performed sweep test and quality
training for our employees to ensure they had the latest training available.
I also trained contractors when the need came up. I set up War Rooms for
various markets to go through cut over or launch. Construction Engineer. Spire Telecoms. Construction.
San Francisco CA.
7/01-11/01 Working for Metro PCS as a Sr. Const.
Eng during the build out of their network for Northern California. I
was responsible for 3 clusters, all sites construction; cradle to
grave. Sr. Field Technician and
Construction Liaison Sprint PCS Net. Ops. and Site
Development
11/96-8/01 I was responsible for the
operation of the network and insuring our Techs. Performed all daily
activities as well as being involved with all outages and trouble shooting of
problem cells. I was a trainer for all new Techs. I also was a go between for
Net Ops and Construction / Site Development insuring that Net Ops. got what
they agreed to when the plans were agreed to including punch walks and all
changes to the build. Field Operations. OSP/ Winstar Wireless9/93-11/96 As a contractor we performed all
the installs for Winstar Wireless in the San Francisco Bay area. We were
tasked to install, path align, optimize, trouble shoot and maintain all of
Winstars Microwave shots in the Bay Area. This included the first point to
multi point shots as well as many stand alone hops. We installed the first
loop system linking 5 buildings in downtown San Francisco. We built the first
large hub site with more than 30 shots being provided from this site. One of
our major projects was the launch of the Sprint PCS Network. We were
installing M.W. shots where they were not able to get land line T1 in time
for launch. Education. Graduated Marina High School,
Huntington Beach CA, 1988 More employment history and
References available upon request. |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|